Gregory E. Richardson
Mission Critical Director
Greg Richardson, Director of Mission Critical projects, with over 13 years experience at the Sr. Project Executive, and Vice President level managing data center and other mission critical projects. Greg began his career over 35 years ago in general contracting working mostly on complex government and private projects. These projects ranged from nursing homes, to renovations at ship yards, to GSA office buildings (including the Pentagon and the White House).
For the past 13 years Greg’s focus has been on data centers. Ten years was with one of the countries premier data site design/ build firms. The past three and a half years was as Vice President of Construction for a COLO data center owner/operator. This experience brings to AccuTech the skill sets needed to do any size Mission Critical project. Whatever the size, whatever the complexity, Greg has successfully complete similar projects. Greg’s style of work is relentless, but calm and orderly, attention to managing details needed to provide the owner with on-time, quality projects, within the budget.
Quick Facts:
Project Role: MIssion Critical Director In Construction Industry Since: 1983
With AccuTech Since: 2018
Education: Business Administration – The Evergreen State College
Certifications: Mentor for “Best You Can Be”
Project Experience
DataSite Orlando
Multi Year project Phases bringing the COLO facility from 2.5MW to 7.2MW
Orlando, Florida
IGT – Florida Lottery Data Center
Renovations to Existing Back-up Data Center
Orlando, Florida
DataSite Orlando
Phase 2 – 2012
Replace legacy UPS system and two water cooled chillers. Demo originals. Install new Liebert UPS, four 750kVA modules, with wet cell batteries. Install two new Smardt, centrifugal, water cooled, 600T chillers. Update BMS.
Orlando, Florida
DataSite Orlando
Phase 3 – 2014
Replace legacy one legacy UPS system with Liebert four 750kVA modules and wet cell batteries; add two 2.5MW CAT Generators; add two Trane 300T air cooled chillers; install two new 12.47kV utility feeds; add new load break, new electrical room with paralleling gear, unit-substations, and associated distribution.
Orlando, Florida
DataSite Orlando
Phase 4 – 2016
Added new UPS room with four module 750kVA Liebert UPS and wet cell batteries. Included 12.47kV feed from existing gear to new unit-substations; and, distribution gear with conduit in place for future use.
Orlando, Florida